Bathroom Gallery

Chocolate Pear Update

Chocolate Pear Update

Instead of starting from scratch, we used the existing vanity, refaced it with a contemporary slab door (in Chocolate Pear), new hardware, new counter, taps, and vessel sink.

Brushed Aluminum Update

Brushed Aluminum Update

Not every bathroom needs to be a full strip down and rebuild. In this case, the vanity was refaced with a brushed aluminum slab door, new counter, and a vessel sink installed.

Shower Surround

Shower Surround

The customer wanted to update their builder's original bathroom (tub surround, vinyl floor) into something more modern. The claustrophobic surround was removed and a more open tub and tile surround was installed. The vanity was kept but with new hardware and new top,...

Custom Shower

Custom Shower

Many newer homes have unfinished basements. The plumbing has been roughed in so you know that someone anticipated a basement bath but now you need to go ahead and complete it. This project on Maidstone will turn an empty space into a luxurious 3-piece bathroom. Custom...

Bathroom Facelift

Bathroom Facelift

If the layout is working, there are ways to upgrade your bathroom without ripping everything out. Check out the Project Scrapbook for more pictures of this renovation.

Update 4-Piece

Update 4-Piece

You don't always have to break everything! In this 4-piece update, some of the old components (that didn't look dated) were re-used.

2-piece to 3-piece

2-piece to 3-piece

Turning a small 2-piece into a 3-piece featuring a walk in shower with custom shower pan. Check out the Project Scrapbook for more pictures of this renovation.

Retro Bathroom

Retro Bathroom

Sometimes old is just that…old. Yet the customer wanted to keep the character of the century home. Check out the Project Scrapbook for more pictures of this renovation.

Elmwood

Elmwood

This bathroom is 100 years old. Yes, 100. The pipes were 40 years past end of life, the walls were 3 inches of masonry atop metal lathe. The home is a double brick home – no studs. This was a messy, messy tear out. Tons (literally) of plaster, masonry, and building...

Custom Ensuite

Custom Ensuite

The 40-year-old bathroom needed an update. Not only was it dated, but a failure to properly install the shower 40 years ago caused lots of water damage that needed to be dealt with.

Bloomfield Update

Bloomfield Update

There was nothing wrong structurally or mechanically with this bathroom. But as you can see from the pink-and-black tiles, it was time for an update. At the same time, we improved accessibility by removing the knee wall, moving the vanity, installing a non-slip floor,...

Ridout Bathroom

Ridout Bathroom

The homeowners desperately needed to update their bathroom in Old South. The layout was terrible, and the entire room was made with plywood rather than plaster or drywall. Several attempts at renovations had been attempted over the past decades, none fixing the...

Schedule a Quote

Tell Us About Your Project

  • Hidden