This was a 1950’s home with the original kitchen. Refacing isn’t possible (the cabinets are built in place — to reface would be a very temporary fix). Plus, the kitchen was completely reconfigured with utilities moved and lighting added throughout.
How long does a project like this take? Typically about 5 weeks.
Click here to see a list of things everyone homeowner should know about kitchen renovations.