Whetherfield Bathroom
This is a newer home so the challenges are far different than a bathroom remodel in Old South or Old North. The plumbing was already roughed in, the layout was already completed, and the drywall was ready. In other words – half the work had already been completed by the builder.
Whetherield Layout 4
Much too early for the shower head, faucets – but this was just so the customer could envision the layout and ensure it was correct.
wetherfield drywall 1
Layout confirmed – and the side rails are for the shower glass. This needed to be done early as the customer wanted the tile to butt against the glass.
IMG_2260
Obviously, the built-in still needs to be painted. The owner has decided to go with two glass shelves.
IMG_2253
What am I showing you here? Well…turns out the original builder reversed the water lines. So the hot and cold were reversed — meaning the toilet was filling with scalding water. Since everything was tiled, I had to open the wall from the backside. Luckily, fairly quick fix.
Schedule a Quote
Tell Us About Your Project